Eastern Alberta Transmission Line
Brooks and Gibbons, Alberta
In 2014, Ledcor completed construction of foundations for ATCO Electric’s eastern transmission line towers included the installation of 92 large diameter cast-in-place piles, ranging from 1.52 m (4.99 ft.) to 3.05 m (10 ft.), with depths of up to 18 m (59 ft.).