Skip navigation
Ledcor Logo
  • Who We Are
    • Vision & Values
    • Safety
    • Executive Profiles
    • History
    • 75th Anniversary
    • Employee Stories
  • What We Do
    • Building
      • Commercial
      • Institutional
      • Light Industrial
      • Residential
    • Communications
      • Field Services
      • Network Design & Build
    • Electricity
      • Power Generation
      • Transmission & Distribution
      • Renewable Energy
    • Energy
      • Oil & Gas
      • Petro-Chemical & Agriculture
      • Pipe Fabrication & Module Assembly Facility
      • Pipelines
      • Structures
    • Infrastructure
      • Deep Foundations
      • Highways, Interchanges, Bridges & Rapid Transit
      • Underground Utilities
    • Mining
      • Coals, Minerals & Metals
      • Reclamation
    • Properties
      • Vancouver Harbour Flight Centre
    • Transportation
      • Marine
      • Aviation
  • Sustainability
    • Our Approach
    • Inclusion & Diversity
    • Ledcor Cares
    • Indigenous Affairs
  • Our Projects
    • Projects by Region:
      • Canada
      • United States
    • Projects by Division:
      • Building
      • Communications
      • Electricity
      • Energy
      • Environmental
      • Infrastructure
      • Mining
      • Properties
      • Transportation
  • Newsroom
    • Newsroom
    • Publications
  • Careers
    • Why Work Here
    • Apply Now
    • Awards
    • FAQ
  • Contact Us
    • Contact Us
    • Subcontractors Forms

Projects: Transmission & Distribution

Suncor Coke Boiler Replacement (High Voltage)

Fort McMurray, Alberta, Canada

Project Gallery

Suncor Coke Boiler Replacement (High Voltage)

Fort McMurray, Alberta, Canada

Furnished high voltage equipments.

Suncor Coke Boiler Replacement (High Voltage)

Fort McMurray, Alberta, Canada

Substation exterior image
  1. Willow Creek Mine
  2. Topsoil Reclamation

The Suncor Coke Boiler Replacement Project consists of the replacement of three existing petroleum coke boilers with two new trains of cogeneration. The three original coke boilers date back to the 1960s and are highly integrated with the Suncor Base Plant assets. The High Voltage (HV) scope consists of completing the furnished high voltage equipment and infrastructure, upgrading existing Oil Sands Base Plant HV Systems, and linking/interfacing Cogen PIant to the Atco infrastructure and the Alberta Interconnected Electric System (AIES, the grid). This work supports a fully functional new cogeneration facility for steam production for Suncor Baseplant operations and power export to the Alberta grid.

  • Who We Are
    • Vision & Values
    • Safety
    • Executive Profiles
    • History
    • 75th Anniversary
    • Employee Stories
  • What We Do
    • Building
    • Communications
    • Electricity
    • Energy
    • Infrastructure
    • Mining
    • Properties
    • Transportation
  • Sustainability
    • Our Approach
    • Inclusion & Diversity
    • Ledcor Cares
    • Indigenous Affairs
  • Our Projects
    • Projects by Region:
      • Canada
      • United States
    • Projects by Division:
      • Building
      • Communications
      • Electricity
      • Energy
      • Environmental
      • Infrastructure
      • Mining
      • Properties
      • Transportation
  • Newsroom
    • Newsroom
    • Publications
  • Careers
    • Why Work Here
    • Apply Now
    • Awards
    • FAQ
  • Contact Us
    • Contact Us
    • Subcontractors Forms

Legal


  • Privacy Policy
  • Terms and Conditions
  • Accessibility Plan
  • Job Offers and Recruitment Fraud
twitter
linkedin
facebook
instagram
youtube

Copyright © 2023 Ledcor Industries Inc.  All rights reserved.

© 2023 Ledcor IP Holdings LTD

 

twitter
linkedin
facebook
instagram
youtube

Privacy Policy

Terms and Conditions