Skip navigation
Ledcor Logo
  • Who We Are
    • Vision & Values
    • Safety
    • Executive Profiles
    • History
    • 75th Anniversary
    • Employee Stories
  • What We Do
    • Building
      • Commercial
      • Institutional
      • Light Industrial
      • Residential
    • Communications
      • Field Services
      • Network Design & Build
    • Electricity
      • Power Generation
      • Transmission & Distribution
      • Renewable Energy
    • Energy
      • Oil & Gas
      • Petro-Chemical & Agriculture
      • Pipe Fabrication & Module Assembly Facility
      • Pipelines
      • Structures
    • Infrastructure
      • Deep Foundations
      • Highways, Interchanges, Bridges & Rapid Transit
      • Underground Utilities
    • Mining
      • Coals, Minerals & Metals
      • Reclamation
    • Properties
      • Vancouver Harbour Flight Centre
    • Transportation
      • Marine
      • Aviation
  • Sustainability
    • Our Approach
    • Inclusion & Diversity
    • Ledcor Cares
    • Indigenous Affairs
  • Our Projects
    • Projects by Region:
      • Canada
      • United States
    • Projects by Division:
      • Building
      • Communications
      • Electricity
      • Energy
      • Environmental
      • Infrastructure
      • Mining
      • Properties
      • Transportation
  • Newsroom
    • Newsroom
    • Publications
  • Careers
    • Why Work Here
    • Apply Now
    • Awards
    • FAQ
  • Contact Us
    • Contact Us
    • Subcontractors Forms

Projects: Reclamation

Northumberland Heap Leach Reclamation

Austin, Nevada, United States

Project Gallery

Northumberland Heap Leach Reclamation

Austin, Nevada, United States

Excavator dumping the soil.

Northumberland Heap Leach Reclamation

Austin, Nevada, United States

Excavator dumping the soil.
  1. Willow Creek Mine
  2. Topsoil Reclamation

Heap leach reclamation earthworks involved excavation and haulage to unweight slopes within the lined footprint, re-grade to 3:1 slopes, and importing of soil capping material from an onsite borrow area. Scope included potholing with excavators and surveying to establish the location of the edge of the liner, repair of previously damaged HDPE liner, and improvements to the drainage collection system.

The project is located in a remote region of Nevada at an elevation of 8,700 ft. This work entails strict adherence to the Nevada Division of Environmental Protection – Bureau of Mining Regulation and Reclamation requirements.

  • Who We Are
    • Vision & Values
    • Safety
    • Executive Profiles
    • History
    • 75th Anniversary
    • Employee Stories
  • What We Do
    • Building
    • Communications
    • Electricity
    • Energy
    • Infrastructure
    • Mining
    • Properties
    • Transportation
  • Sustainability
    • Our Approach
    • Inclusion & Diversity
    • Ledcor Cares
    • Indigenous Affairs
  • Our Projects
    • Projects by Region:
      • Canada
      • United States
    • Projects by Division:
      • Building
      • Communications
      • Electricity
      • Energy
      • Environmental
      • Infrastructure
      • Mining
      • Properties
      • Transportation
  • Newsroom
    • Newsroom
    • Publications
  • Careers
    • Why Work Here
    • Apply Now
    • Awards
    • FAQ
  • Contact Us
    • Contact Us
    • Subcontractors Forms

Legal


  • Privacy Policy
  • Terms and Conditions
  • Accessibility Plan
  • Job Offers and Recruitment Fraud
twitter
linkedin
facebook
instagram
youtube

Copyright © 2023 Ledcor Industries Inc.  All rights reserved.

© 2023 Ledcor IP Holdings LTD

 

twitter
linkedin
facebook
instagram
youtube

Privacy Policy

Terms and Conditions