In June 2014, Ledcor installed pipeline on Enbridge's South Edmonton Terminal to satisfy three projects: Kinder Morgan Interconnect Piping, Edmonton to Hardisty (E2H) Pipeline and the Woodlands Pipeline Expansion (WPE).
The scope of work included approximately 4.7 km of NPS (Nominal Pipeline Size) 36 pipeline in multiple areas, 2.4 km of which were HDDs (Horizontal Directional Drills) plus 2.3 km of pipe installed through open cut methods. This work encompassed the entire Shell Lands section southeast of the existing Edmonton Terminals.