Project Profile

Project Profile

Christina Lake Lateral

Enbridge Inc.

Conklin, Alberta

Ledcor completed construction of 26 kilometers (16 miles) of 30-inch diameter pipeline for Enbridge. The pipeline will support the expansion of the Christina Lake enhanced oil project, which is operated by Cenovus Energy.

Enbridge’s existing Christina Lake lateral and terminal facilities included two 8-inch lateral lines plus 240,000 barrels of tankage and connected the enhanced oil project to Enbridge’s Athabasca Pipeline. The Athabasca Pipeline, together with the Waupisoo Pipeline and associated lateral and terminal facilities, constitute Enbridge’s Regional Oil Sands System, delivering crude oil from five producing oil sands projects to the Hardisty and Edmonton mainline hubs.
Send to a friend Print Page Share this