Project Profile

Project Profile

South Fraser Perimeter Road

Province of British Columbia / Fraser Transportation Group

Delta & Surrey, British Columbia

By Spring 2012, work was more than halfway complete on the South Fraser Perimeter Road, a $1.3 billion project serving Metro Vancouver. It’s the largest civil construction project Ledcor has worked on in British Columbia’s Lower Mainland.

The four-year design and construction process includes a new 34 kilometer (21 mile), four-lane highway on the south side of the Fraser River. With connections to Highway 99, Highway 91, the Trans-Canada Highway, the Pattullo Bridge and the Golden Ears Bridge, the route will be a major step towards improving Metro Vancouver’s road network. It’s expected to remove heavy truck traffic from local roads, reduce travel times through the region, and improve access to major trade gateways and industrial areas.

As part of the Fraser Transportation Group, Ledcor is partnering with Dragados, BellPacific and Vancouver Pile Driving to complete the project. We also share a 20-year commitment to operating and maintaining the road with ACS Infrastructure Canada.

Traffic is scheduled to be on the road in 2013.
Send to a friend Print Page Share this